Lancaster Field Early Production System (EPS)

Client: Hurricane Energy

Region: UK

Office: Southampton

Operator’s engineering team secondments for the planning, development, and delivery of the EPS FPSO. Engineering for new turret mooring buoy, and FPSO upgrades, repair and life extension, executed by Bluewater Energy Services in The Netherlands. Construction and conversion works carried out by Drydocks World-Dubai, UAE.

press to zoom

press to zoom
1/1

Operator’s engineering team secondments for the planning, development, and delivery of the EPS FPSO.


Scope included:

· Identification and selection of a suitable candidate FPSO, and assisting client engagement with FPSO owners;

· Technical and management support through pre-FEED and FEED to develop the field Basis of Design, FPSO Functional Specification, and review contractor’s technical, compliance and project execution deliverables;

· Supply of FPSO delivery team to manage the FPSO contractor throughout the detailed engineering and construction phases, consisting of delivery manager and technical specialists in the areas of hull and moorings, topsides and facilities, and construction and commissioning;

· Delivery team provided progress monitoring and internal reporting, interface management, technical document review, involvement in HAZID/HAZOP, and technical safety support (IVB, Class, regulatory compliance);

· Conversion yard supervision of construction and commissioning works, including compliance auditing in lead up to “Ready for Sail-away” approval;

· Remote support to final commissioning, pre-start, and post-start-up.


Engineering for new turret mooring buoy, and FPSO upgrades, repair and life extension, executed by Bluewater Energy Services in The Netherlands. Construction and conversion works carried out by Drydocks World-Dubai, UAE.